九九热在线免费-九九热在线免费观看-九九热在线视频观看这里只有精品-九九热这里只有国产精品-九九日韩999-九九日欧美红桃视频


DDDL-500-100Three phase voltage and current source
  • Product name: DDDL-500-100Three phase voltage and current source

  • Product model: DDDL-500-100

  • Release time: 2018-07-19 10:45:19

  • Manufacturer: Great electric equipment Co., Ltd.



功能描述

DDDL-500/100 three-phase voltage and current source is a test product developed by our company. It combines the advantages of similar products at home and abroad, uses numerical control technology, has strong anti-interference ability, and is compared with the previous generation of current current. Because of the use of low power, large capacity autotransformer and high guide magnet core converter, The utility model has the advantages of large power, small volume and light weight. It is mainly used for thermal relays, motor protectors, contactors, circuit breakers, air switches, switchgear, protective screen calibration.

 

major function

A long time output of 0 ~ 100A*3 current

0 ~ 5000V*3 voltage can be output for a long time

At the same time, it can connect several serial checks to improve efficiency.

儀器特點

A beautiful and generous PVC panel

High measurement precision

High power, small volume, and strong load capacity

Small size, light weight, only 30% to 70% of the volume of similar products.

Operational aspects

(1) after the connection is completed, check it again to see if there is any wiring error and whether the connector is in good contact.

(2) during the testing process, if there is fire, and no indication is displayed when starting, the power supply should be shut down immediately.

Check connection

(3) in actual wiring, the current output terminal should form a loop, otherwise there will be no current output.

This lift is equipped with a random output wire and the output copper wire is selected according to 10A/mm2.

(5) the capacity of the equipment is designed according to the 5 minute short time operation, for example, the batch test should be less than 2.5 minutes.

Clock, wait for 10 minutes, then do the next work. If the temperature rise (30 minutes -24 hours) should be according to length

Time work temperature rise configuration


技術參數

1. names and classifications

(1) Name: three phase voltage and current source.

(2) environmental group: the III group instrument in the GB6587.1-86 environmental test general specification for electronic measuring instruments (can be used in outdoor environment).

(3) input AC 380V three-phase four wire, 50HZ

(4) output 0-100A three-phase AC current: the 0-500v three-phase AC voltage output current is the standard sine wave, the burr is small, it is better than the standard of the power system requirements, the ripple coefficient is less than 0.3%

(5) output current mode: the RMS is adjustable continuously.

(6) output waveform: standard sine wave

(7) the opening voltage of the output of the current end is more than 3V

(8) precision: the current and voltage can be smooth and continuous adjustment, the precision is higher than level 0.5, the voltage ammeter shows true value, high precision, high stability

(9) current stability: 0.2%

(10) distortion of current waveform: THD1%

(11) power: 1000VA*3

 

Three operation description

 

1. before the power supply is connected, the power switch should be disconnected first, and all the handles are turned back to zero position counterclockwise.

2. the power input terminal is connected with the AC380V three-phase four wire voltage, and then the sample is connected to the corresponding voltage and the current output terminal.

3. after the connection is completed, close the "power switch" and press the "start" button to adjust the corresponding current and voltage in a clockwise manner. After the end of the experiment, press the "stop" button.

 

Four safety precautions

1, in order to ensure the safety of operators and instruments, ensure good grounding.

 

2, when the experiment is ready, it is best to connect the ground wire first, and finally, when the work is finished, remove the ground wire.

 

3, the power supply of the access instrument can withstand the current impact of 45A.

 

4, when the instrument is connected with the test product, check whether the wiring is wrong, so as not to cause equipment damage due to wiring errors.

 

5, the maximum current value of the over-current protection should not exceed the rated output current value of the instrument.

6, no connection can be inserted in the case of power on.

 

Eight transportation and maintenance

1. transport:

The product must be packed during transportation. The packing box should be wooden box, and foam proof layer should be used in the packing box. Packaged products should not be placed in open-air garage during road, railway and air transportation. The storehouse should pay attention to rain protection, dust prevention and mechanical damage.

2. storage:

The instrument should be stored in an environment of -40 to 60 degrees centigrade with a relative humidity of not more than 85%, ventilated and corrosive free.

It should not be placed only on the ground and walls.

3. dust prevention:

In humid areas or in wet seasons, this instrument is required to open electricity once a month (about two hours) to protect the electronic components, if it is not used for a long time.

 

4 insolation

When the instrument is used outdoors, avoid or reduce the direct exposure of sunlight to the screen as far as possible.

Library.

Nine random appendage

A set of 1. power lines

2 a copy of the instructions

3 Certificate of qualification

One copy of 4 warranty card

 

Ten quality assurance and after-sales service

1, the instrument is manufactured in strict accordance with national standards and enterprise standards. The IS09000 standard is strictly enforced in the production process to ensure the quality of the instrument.

2, the instrument will have a shelf life of one year. During this period, the quality of the instrument is lower than the requirements due to manufacturing reasons. The company will maintain it free of charge.

3, the instrument has three packages.

4, in the service life of the instrument, the company will provide maintenance, training, accessories and other related services.

5, if the problem is found in the use, please contact our company in a timely manner. We will take different ways according to different circumstances: door-to-door maintenance guidance or return factory maintenance

主站蜘蛛池模板: 国产精品69久久久久孕妇欧美| 国产精品不卡一区二区三区在线观看免费在线观看高清完 | 欧美日韩大陆| 天天拍拍国产在线视频| 变天就草逼| 亚洲熟妇无码一区二区三区导航| 国产高潮流白浆免费视频| 色婷婷综合网站| 国产无遮挡又黄又爽又色| 久久久久久国产a免费观看黄色大片| 九九久久精品国产免费看小说| 久久精品久久久久久清纯| 久热精品在线视频| 麻花豆传媒剧免费mV| 欧美人妖| 第一福利视频| 欧美日韩精品另类视频| 亚洲午夜成人精品| 热の综合热の国产热の潮在线| 色综合久久加勒比高清麻| 日韩成人a级毛片免费观看| 2024高清一道国产电影在线观看 | 中文字幕无码久久久久久久| 国产高清无码一区| 久久不卡西瓜| 国产调教丰满欧美最近中文字幕m 国产调教丰满欧美最近中文字幕mv高清在线 | 欧美一区二区三区久久综| 精品久久久久久清纯| 色噜噜噜AV亚洲男人的天堂| 精品视频在线观看一区二区三区| 亚洲AV无码男男A片在线观看 | 国产欧美日韩精品第二区| 国产精品高潮呻吟久久影视A片 | 亚洲自偷自偷图片在线高清| 东京热一区无码视频| 亚洲午夜精品在线视频| 成人亚洲a片v一区二区三区麻豆| 亚洲午夜精品一区二区三区| 成人午夜无码| 亚洲第一区精品观看| av性天堂网|